President Patrick F. Leahy announced on Friday a new, $3.5 million dollar project that is scheduled to begin in May 2017 and to be completed by fall of 2018. The project, Leahy announced, would be the creation of a South Campus Gateway. The gateway, he said, would not be dissimilar to the East Campus Gateway […]
President Leahy announces construction of “South Campus Gateway”
Posted on September 30, 2016
Originally Posted on The Beacon via UWIRE
Read more here: http://www.thewilkesbeacon.com/news/2016/09/30/president-leahy-announces-construction-of-south-campus-gateway/
Copyright 2024 The Beacon